scaffold access for Dufferin Bridge project with tarp enclosure
Bridge Access & Enclosure

Project Details Our Role Engineered Bridge Access & Enclosure Location Grand Valley, ON Delivery Date 2020 Project Summary Northstar Scaffold (Ontario) Inc. was retained to supply, install, and dismantle scaffolding for an engineered access to the underside of this bridge in Dufferin County. The scaffold structure was roughly 160’ long by 40’ wide providing full […]

Church Spire Restoration Access
Church Spire Restoration Access

Project Details Our Role Church Spire Restoration Access Location Oshawa, ON Delivery Date 2019 Project Summery Our crews built this 140ft tall structure during the late summer months of 2019. The structure includes over 180 steps providing access to the church spire. Fully fitted with debris mesh and completed with overhead protection below, this scaffold […]

Clock Tower Restoration Access

Project Details Our Role Clock Tower Access Scaffolding Location Toronto, ON Delivery Date 2020 Project Summery Northstar was retained to provide access to the Carillon Clock Tower located in Exhibition Place, downtown Toronto throughout a restoration project. At over 80’ feet high, the four-sided access tower was fitted with debris netting during the first phase […]

Commercial Wall Access & Overhead Protection

Project Details Our Role Swing Stage Wall Access, Overhead Protection, & Stair Tower Location Toronto, ON Delivery Date 2020 Project Summery Northstar Scaffold (Ontario) Inc. was retained to provide access scaffold, overhead protection, and wall access at the commercial building located downtown Toronto. The project proved to have a few design challenges and the structure […]

Heritage Building Restoration Access

Project Details Our Role Restoration Access Location Cambridge, ON Delivery Date 2018 Project Summery Northstar Scaffold was retained to provide over 20,000 sq. ft. of access to the entirety of the residential building. Adjacent to the Mill Pond next to the Guelph Avenue bridge in Cambridge, this project has a full run of scaffolding right […]

Overhead Access & Pedestrian Protection Viana Roofing ChurchSt
Overhead Access & Pedestrian Protection

Project Details Our Role Overhead Access & Pedestrian Protection Location Toronto, ON Delivery Date 2020 Project Summary Northstar was retained to provide over 230 linear feet of overhead access to ensure pedestrian safety. As part of the roof replacement project at 561-571 Church Street in downtown Toronto, the structure was partially fitted with high visibility […]

Heritage Building Weather Beacon Access

Project Details Our Role Heritage Site Engineered Access Location Toronto, ON Delivery Date 2020 Project Summery Northstar Scaffold (Ontario) Inc. was retained to supply, install, and dismantle  engineered scaffolding access to the weather beacon on top of the landmark building in downtown Toronto. At approximate 42’ high and 20 stories above ground level, our crews […]

Distribution Plant StrapRail
Distribution Plant StrapRail

Project Details Our Role StrapRail Edge Protection Location Vaughan, ON. Delivery Date 2020 Project Summary Northstar Scaffold (Ontario) Inc. was retained by a long- term client  to assist in the safety requirements at a Automated Distribution Plant located in Vaughan, ON.  With over 2500 linear feet of combined StrapRail and girder clamp guard rails within […]

Shoring Manufacturing & Production image by Northstar Access
Greenhouse Refurbishment & Upgrades

Project Details Our Role Various Access Solutions; Roof Access, Interior and Exterior Platforms Location Niagara on the Lake, ON Delivery Date 2019 Project Summary Northstar was retained to provide access scaffolding for restoration work on numerous greenhouses and buildings. The project involved the roof refurbishment and maintenance along with the erection of multiple protection platforms […]

Drydock Temporary Roof & Enclosure
Drydock Temporary Roof & Enclosure

Project Details Our Role Drydock Temporary Roof & Enclosure Location Vancouver, BC Delivery Date 2019 Project Summary The Burnaby team was proud to complete the installation of one of the company’s largest jobs. The project was for a long term Drydock client who services large marine vessels throughout the year at their facility in North […]