Project Details
-
Our Role
Restoration Access -
Location
Cambridge, ON -
Delivery Date
2018
Project Summery
Northstar Scaffold was retained to provide over 20,000 sq. ft. of access to the entirety of the residential building. Adjacent to the Mill Pond next to the Guelph Avenue bridge in Cambridge, this project has a full run of scaffolding right along the Riverbank Lofts building as the heritage building was converted into residential condominiums. It required a high level of scaffolding expertise to install the structure safely along the very narrow riverbank below. The project also involved over 10,000 sq. ft. of interior shoring.