Northstar Access scaffolding setup on a roof at Danforth site
Rooftop Scaffold Access Towers for Window Replacements

Project Details Our Role Rooftop Scaffold Access Towers for Window Replacements Location Toronto, ON Delivery Date June 2024 Project Summary Our Toronto team successfully completed a scaffold access project designed to support the window replacement project the Centre for Adult Learning School in Toronto, ON.  The restoration project involved six bay windows situated at the […]

swing stage installed with orange debris mesh
Swing Stage Access for High-Rise

Project Details Our Role Swing Stage using Davit Beams Location White Rock, BC Delivery Date July 2023 Project Summary Our Vancouver swing stage team was recently a part of a unique project at the Soliel Building in White Rock, BC.Due to the unique characteristics and access demands of the building, a ground-based swing stage was […]

Commercial Swing Stage set up on a downtown Toronto highrise for a building Sign Installation
Commercial Swing Stage Sign Installation

Project Details Our Role Swing Stages Location Toronto, ON Delivery Date December 2021 Project Summary Located downtown Toronto, our swing stage team installed a total of 6 swing stages for this building in need of new signage, 3 stages on the west side and another 3 on the northside.At approximately 500ft above street level, winter […]

Swing stage set up for residential high rise building access
Residential Swing Stage Access & Overhead Protection

Project Details Our Role Swing Stage & Overhead Protection Location Toronto, ON Delivery Date 2020 Project Summary Northstar Access was retained to provide worker access to 100% of the building façade while maintaining full access to all egresses. This included the loading dock and main “round-about” entrance while also protecting the oversized glass canopy. To […]

Church Spire Restoration Access
Church Spire Restoration Access

Project Details Our Role Church Spire Restoration Access Location Oshawa, ON Delivery Date 2019 Project Summery Our crews built this 140ft tall structure during the late summer months of 2019. The structure includes over 180 steps providing access to the church spire. Fully fitted with debris mesh and completed with overhead protection below, this scaffold […]