[elementor-template id="4107"]

Contacts
  • TORONTO
Swing stage set up for residential high rise building access
Project Details

  • Our Role
    Swing Stage & Overhead Protection
  • Location
    Toronto, ON
  • Delivery Date
    2020

Project Summary

Northstar Access was retained to provide worker access to 100% of the building façade while maintaining full access to all egresses. This included the loading dock and main “round-about” entrance while also protecting the oversized glass canopy. To achieve this, Northstar utilized multiple custom designed swing stage setups suspended from a combination of temporary outrigger beams and davit arms. At the ground level, keeping the loading dock operational for its daily deliveries and pickups was a priority for our client and building management. Northstar successfully provided a solution that allowed full access for transport trucks and minimized the loss of parking spaces while also maintaining safe passage for pedestrians and building residents.
Palace Pier Building under Construction with Swing Stages and Material Hoists
Palace Pier Construction Site
architeck-subscribe-image
Subscribe Now and Stay Informed
Our newsletter includes articles, project updates and organizational news.
Sky-Hi Scaffolding Logo

Is now

Northstar Access Logo with tag line Your Build Our Business
FREE QUOTE